Remove existing coating prior to installation.
Pressure wash the area.
Fill and level all cracks and uneven areas.
Mask off adjacent area.
Apply 1st coat with a hopper. Allow 1st coat to dry, 2 to 3 hr. depending on temperature.
Apply 2nd coat of Deco Roc.
Once 2nd coat is dry remove all excess material from expansion joints.
Seal the area with Supremes 100% solid epoxy sealer.